The Latest
Month: May 2019
![](https://www.centersteps.com/wp-content/uploads/2019/05/IMG_4041-Small-768x576.jpg)
We’ve Got Walls!
The construction team is now finishing up the last of the concrete installation on residential levels. The floor for Level 3 will be cast tomorrow, 5/30, and will require an…
![](https://www.centersteps.com/wp-content/uploads/2019/05/IMG_3888-small-768x576.jpg)
New Mural and Completion of Major Concrete
We are happy to announce that we have replaced the construction perimeter fence with a mural that includes vibrant color and expressive faces along Mercer Street. We hope that you’ve…